Home
>
Project Performance
> Water Conservancy Project
Drainage Improvement and Bridge Reconstruction Works of Shek Ka Drainage Branch Line (Phase III).
Longjing District Foot Drainage 3K+066~3K+636 Treatment Project
Flower bed drainage upstream diversion and bridge reconstruction works
Toyota Industrial Area Drainage System Enhancement Project
Improvement works for the downstream of the Ngau Po Creek Drainage Han Tsai Hau Bridge
Tainan City, Yongkang District, Xiwanli Detention Pond Project
Construction of the South Drainage Diversion System and the Lake Pumping Station in Chiayi City
Yuanlin ditch drainage upstream multi-functional disaster prevention park project
Nine ditch ditch detention pond project in the new community
Feasibility assessment of hydroelectric power generation for additional water intake in Shimen Reservoir
Civil engineering design of Wushantou Hydroelectric Power Plant
Design of civil engineering construction of Xikou Hydroelectric Power Plant
The first phase of the implementation plan of the flood control plan in flood-prone areas is planned for the drainage system of the county (city) district and the Xintianliao