Design of civil engineering construction of Xikou Hydroelectric Power Plant

Client : Jianan Industrial Company
Project Location : The junction of Dongshan Township and Liujia Township, Tainan County
Programme Duration : 
    October 10, 91 ~ February 28, 92
Program Overview : 
    Xikou Hydropower Plant is located on the main stream on the northeast side of Wushantou Reservoir, the power plant is based on the water flowing into Wushantou Reservoir through the overflow shaft at the west entrance and its drop of about 25 meters to build a semi-surface power plant for power generation, the power plant building adopts a semi-underground type, 29 meters long, 22.55 meters wide and 20.61 meters high, the total length of the pressure steel pipe section is 20.5 meters, the diameter of the steel pipe is 4.4 meters ~ 3.7 meters, and the tail water section adopts a rectangular box culvert with a width of 4.6 meters and a height of 2.7 ~ 4.0 meters. The plant is equipped with a vertical shaft slurry type French hydro turbine generator, with a total designed water consumption of 52.0 cubic meters per second, a design water head of 24.5 meters, and a total capacity of 11,520 watts and an annual power generation of 450000 kWh.