rainage Improvement and Bridge Reconstruction Works of Shek Ka Drainage Branch Line (Phase III).

Client : Changhua County Government
Project location : Dacun Township, Changhua County
Program Overview : 
    The improvement section of the "Shijia Drainage Branch Line (Phase III) Drainage Improvement and Bridge Reconstruction Project" (Area 1) is from the bridge in Dacun Village to the front of the Meili Bridge, with a total length of about 0.9 km, while widening the drainage section of the Shijia Drainage Channel, it also widens the water defense roads on both sides of the river, and can replace the foot of the mountain road or Zhongshan Road from the Bagua Shanyuan Waterway to Changhua City, taking into account the diversion of flood drainage and traffic flow, which can ensure that the channel can pass the flood front flow with a return period of 10 years and the flood front flow with a return period of 25 years. Improve the flood prevention safety of local residents in Dacun Township, reduce the risk of flooding, and protect the safety of people's lives and property.
    Main project contents: 1. Revetment improvement project 1,835m, 2. Bridge reconstruction project - Mimura Bridge: close-row pre-force I-beam bridge, width 10m, length 19.8m.