The first phase of the implementation plan of the flood control plan in flood-prone areas is planned for the drainage system of the county (city) district and the Xintianliao

Client : The Sixth River Bureau, Water Resources Administration, Ministry of Economic Affairs
Location : Beimen Township, Xuejia Township, Yanshui Town, Xinying City, Tainan County
Programme Duration : 
    From January 96 to January 99 of the Republic of China, the drainage planning and treatment plan were completed
Program Overview : 
    Xintianliao drainage system is located in Tainan County, the administrative area is subordinate to Xinying City, Yanshui Town, Xuejia Town and Beimen Township, belongs to regional drainage, the length of the main branch is about 30 kilometers, the catchment area is about 76.84 square kilometers, the main reasons for flooding are the high water level outside the rapid stream, the difficulty of internal water removal, the lack of drainage and flood capacity, and the construction of drainage projects without overall planning considerations. In addition to ensuring the function of flood control and drainage, the planning and design of this plan should conform to the concept of comprehensive water control and the overall planning of the catchment area, and combine the overall management of the upstream, middle and downstream of the catchment area and take into account safety, ecology and landscape, so as to achieve the highest goals of water control, water benefit, hydrophilia, living water and water retention.