Civil engineering design of Wushantou Hydroelectric Power Plant

Client : Jianan Industrial Company
Location : Wushantou Reservoir (Guantian Township, Tainan County)
Programme Duration : 
    February 89 ~ May 89 of the Republic of China
Program Overview : 
    Wushantou Hydroelectric Power Plant is the use of Wushantou Reservoir and the water inlet at the head drop of more than 20 meters to produce hydroelectric power, in the Republic of China 89 October construction, after 2 years of rush, to the Republic of China 91 June completed, in August of the same year test operation. The power plant building adopts a semi-underground type, 20 meters long, 20 meters wide, 33.9 meters high, the total length of the pressure steel pipe section is 52.4 meters, the diameter of the steel pipe is 3.6 meters ~ 3.2 meters, the tail water section is 25 meters long, the rectangular box culvert is 5.2 meters wide and 4.4 meters high, and the plant is equipped with a motor with a capacity of 8,750KW and a vertical shaft KAPLAN turbine, the design head of hydropower generation is 24.10 meters, the design flow rate is 41 cubic meters per second, and the annual power generation is 42. 170,000 degrees.