Taiwan 14 Line B Military Bridge Reconstruction Project

Entrusting unit : Maintenance Engineering Office of the Second District of the General Administration of Highways of the Ministry of Communications
Location : Nantou City, Nantou County
Schedule : Planning and design in October 104 of the Republic of China, completed in March of 106 of the Republic of China
Program Overview : 
    The length of the bridge is 260 meters, and the width of the bridge is 24 meters. Across Maoluo Creek, the main span is increased to 100 meters, and only 2 piers are dropped in the water area (7 piers before the reconstruction), which greatly improves the effective water section of the riverbed and reduces the erosion of the piers.