Zhongzhuang Adjustment Pond Project Plan - Barrage Project

Awards : 
    Won the 104th Annual Administrative Agency, the 15th Public Works Gold Award, and the Excellence Award in the Water Conservancy Category  Excellent

Client : Water Resources Administration, Ministry of Economic Affairs
Location : Daxi District, Taoyuan City
Programme Duration : 
Program Overview : 
    In addition, when the large typhoon and rain events occurred in the past, a large amount of soil and rock brought by the upper reaches of Dahan River caused the turbidity of Shimen Reservoir and Dahan River water sources to soar, exceeding the treatment capacity of the water purification field, resulting in serious water shortages in Taoyuan area and Banxin area, such as when Typhoon Avery hit in 93 years of the Republic of China, resulting in a water shortage in Taoyuan area for 18 consecutive days, which had a great impact on people's livelihood inconvenience and industrial investment willingness. In order to increase the water supply capacity of the regional water source, reduce the risk of water shortage due to the rise of turbidity in the water source of Dahan Creek Yuanshan Weir, remediate the Zhongzhuang waste river channel in response to local needs, and cooperate with the overall environmental construction of the Dahan River section, the Zhongzhuang Adjustment Pond Project Plan - Barrage Project was handled.
     Its main projects are as follows:
    Dumping movable weir, left bank sand drainage channel and fish passage, upstream and downstream protection workers, weir surface protection workers, water inlets, diversion roads, bank revetments, liaison bridges, operation rooms, Zhongzhuang adjustment pool engineering plan mechanical and electrical engineering.