The 12th phase of Taichung City's rezoning district Huanzhong Road sewage main pipe project

Client : Taichung City Government
Program Location : Huanzhong Road, Taichung City
Programme Duration : 
Program Overview : 
    In order to improve the water quality and environmental sanitation of water bodies in the city, reduce the pollution load of water bodies downstream, improve the overall urban development of Taichung City and improve the quality of life, so that urban construction and natural environment can achieve the goal of sustainable development, the Taichung City Government has planned to set up sewage sewers from the east of the slow lane of Huanzhong Road to the right-of-way line in the 12th Fuxing City Rezoning District, Xitun District, Taichung City, with a total length of 1,640m.
    Huanzhong Road Sewage Trunk Pipe Project: ψ1200mm RCP pipe linkage propulsion: 1600 meters, 9 oval steel-lined sheet metal propulsion working wells, 8 circular steel-lined sheet metal reaching working wells, 17 pre-cast C2 manholes, the twelfth phase of the rezoning area branch trunk pipe connection project: ψ300mm PVC-PE sewage straight pipe buried 89 meters, ψ600mm RCP sewage straight pipe buried: 29 meters.