Taiwan 74 Line A and Taiwan 14 Line Three-dimensional Intersection Project

Entrusting unit : Maintenance Engineering Office of the Second District of the General Administration of Highways of the Ministry of Communications
Location  : Changhua City
Programme Duration : 
    Construction started in 97 years of the Republic of China;
    It was completed in November 100 of the Republic of China
Program Overview : 
    The project starts from 0K+942 to 1K+820 of Taiwan 74 Line A, with a total length of about 878 meters, of which the viaduct is from 1K+017 to 1K+570, with a total length of 553 meters, a net width of 19.7 meters on the bridge deck, and a roadbed pavement width of 30 meters, and two northbound and southbound ramps with a width of 3.5M on the north side of Taiwan Line 14 (Zhangnan Road) are each 72.5M long, serving passers-by to and from Changhua, and can enter Changhua City, Nantou or Taichung through Taiwan Line 14 (Zhangnan Road).