Feasibility planning of Zhongzhuang adjustment pool - overall environmental construction planning

Client : Water Conservancy Planning Laboratory, Water Resources Administration, Ministry of Economic Affairs
Location : Daxi Town, Taoyuan County
Programme Duration : 
    From December 25, 96 to June 30, 97
Program Overview : 
    This project belongs to the sub-project of the "Zhongzhuang Adjustment Tank Feasibility Plan", which is part of the greening of the regional environment and the creation of leisure activity space after the completion of various projects (water intake project, adjustment tank project and water conveyance project) in the main plan. The adjustment pond was originally a waste river channel in Zhongzhuang, which belongs to the Dahan River area, and is developed together through the configuration of water areas and green spaces, and in conjunction with the multi-objective plan of the Dahan River Environmental Management Plan.
    The planning concept is to create a water environment and recreation space with multiple functions such as water sources, ecological conservation, environmental education, and hydrophilicity, and combine the surrounding river environmental planning to create a high-quality landscape in the Dahan River Basin. And it is used in the overall construction of the environment of Zhongzhuang adjustment pond to create an ecological, leisure, educational, and landscape waterfront recreation area on the green side of Zhongzhuang, and combined with the external environmental resources, to provide a natural idyllic rest experience, with a slow and slow life attitude, to experience the natural sounds of the four seasons, the evolution of animal and plant ecology and the creation of human life culture.