Client : Kaohsiung City Government Water Conservancy Bureau
Location : Sanmin District, Kaohsiung City
Program Overview :
Since the upper reaches of the Ai River originate from Renwu District of the city, and because the district has not yet promoted the construction of sewage sewers, household sewage, agricultural return water and sporadic factory wastewater flow into the Ai River through Jiu Pan Pi, Bei Wu Drainage and Zhangzi Lin Pi respectively, the Water Conservancy Bureau has set up on-site treatment of the three tributaries to purify the water quality and then re-inject the Ai River with ecological and environmental protection construction methods. In order to improve the gravel treatment efficiency of Smile Park, a rubber dam will be set up under the Minzu Bridge, and the gravel treatment efficiency will be improved, with about 9000CMD of water intercepted per day and re-injected into the river after treatment, so as to provide a clean and stable base flow. It is expected that after the completion of the project, the water quality of the Love River will be improved, and the entire Love River basin will show more beautiful waterfronts.
Project Description:
(1) Rubber dam structure engineering: 1 rubber dam with 1.5mHx12mL
(2) Rubber dam mechanical equipment engineering: Lu's blower and related electric butterfly valves, gate valves, pressure sensors and pipelines
(3) Ground engineering: D = 100cm reverse circulation drilling concrete foundation pile, 9 pieces
(4) Environmental engineering: 1 group of mechanical trash racks
(5) Electrical engineering: low-voltage switchboards, switchboxes and switches and other electrical equipment; Programmable control and monitoring and graphic control software, system testing, adjustment and trial operation, Party A's operator training and teaching materials and other instrumentation and control projects