Client : Taichung City Government
Planned Location : Dali District, Wuri District, Taichung City
Program Overview :
The existing topographic conditions of the two catchment areas and the gravity drainage conditions of the drainage road are generally good, but the drainage problems in this area are mainly due to the high water level outside Dali Creek, the flooding of the downstream low-lying areas caused by the closure of the drainage outlet gate, and the insufficient height of some drainage canals, the siltation of the bottom of the canal, and the frequent flooding of the overflow bank. Therefore, the new pumping station of the Zhongxing section of this project uses diesel engines to directly drive the pumping machine to assist flood discharge, which can reduce the risk of regional flooding and improve the quality of life.
The main project contents are: pumping station room, pumping machine (vertical shaft pumping machine 6CMS) including diesel engine power unit, sewage removal mercury unit (5HPx2), inlet gate (5.0W×3.5H) 2 doors, electric double-rod hanging door machine (lifting force above 9.0T) 2 doors, and related mechanical and electrical equipment engineering.