Yuzu Grove Line Water Gate Improvement Project

Awards : 
    Won the "2019 Urban Engineering Quality" from the Kaohsiung City Government  Gold Award
Entrusting unit : Kaohsiung Management Office, Farmland and Water Conservancy Administration, Agricultural Committee, Executive Yuan
Location : Meinong District, Kaohsiung City
Programme Duration : 
    The Republic of China started construction on January 04, 108;
    It was completed on August 31, 108 of the Republic of China
Program Overview : 
    The project is located in Zhuzimen Drainage 4K+435 (Zhuduan 23), Meinong District, Kaohsiung City, and the protection standard is 10 years of return period and 25 years of return period from the principle of not overflowing the embankment, so that residents can reduce the probability of flood threat and reduce flooding.
    The project includes the renewal of the main structure, upstream and downstream protective tanks, left and right side revetments, 2 dumping gates (W14.5mxH2.85m), 2 water intake direct gates (W1.0mxH1.1m) and 2 trash racks (W1.0mxH1.1m).