Awards :
Won the 2008 National Construction Excellence Award in the 2008 National Construction Excellence Award for Best Planning and Design Merit Award
Contractor : Taipei Water Supply Office (Contractor: Weimeng Industrial Co., Ltd.)
Program Location : Taipei City
Programme Duration :
September 95 ~ October 98 of the Republic of China
Program Overview :
In order to cooperate with the development of the Nangang Economic and Trade Park and meet the water demand of the East Water Supply Zone, the Taipei Water Supply Office has established this project to increase the water supply capacity of the system by connecting the Neihu and Nangang water supply areas at the Minquan Bridge, Chenggong Bridge and Nanhu Bridge, and at the same time connecting with the Xizhi water supply system.
This shield project is connected by the Minsheng Pressurized Station through Guangfu North Road, Minquan East Road, crossing the Keelung River to the high beach on the right bank, and then connecting with the starting point of the excavation project along the high beach through the Minquan Bridge, and then connecting with the starting point of the excavation project from the Neihu Garbage Mountain, and continuing to build the latent shield pipeline through the Nanhu Bridge and the existing common pipeline connection of the Nangang Economic and Trade Park, the whole line of the latent shield project is about 3925 meters long, which is contracted by Weimeng Industrial Co., Ltd., and the company is the co-design consultant.