The second safety assessment of the Luohao Reservoir of Guishan Power Plant

Client : Guishan Power Plant, Taipower Corporation
Location : Wulai Township, Taipei County
Programme Duration : 
    January 97 ~ January 98 of the Republic of China
Program Overview : 
    The Luohao Reservoir Dam was originally a river-type concrete gravity dam built in the 36th year of the Republic of China, and Taipower Company rebuilt and added an arc-shaped gate in the 52nd year of the Republic of China in order to cooperate with the peak power generation; The dam is located on Nanshi River, a tributary of Xindian Creek, and the water diverted from the dam is sent to the Wulai unit of the downstream Guishan Power Plant through a 4.8-kilometer tunnel to generate electricity. Reservoir safety is the foundation of reservoir operation and management, according to the provisions of Article 17 of the "Measures for the Inspection and Safety Assessment of Water Conservancy Structures" formulated on December 3, 92 of the Republic of China, a certain period of normal use needs to be subject to regular assessment.