Consignee : Taiwan Water Supply Co., Ltd
Location : Xixiang, Changhua County
Program Overview :
In recent years, the water demand of Zhangbin Industrial Zone has increased greatly due to the influence of large factories at home and abroad, and the current water supply capacity of Changhua tap water system in North Changhua has become saturated.
The project includes Zhenwei raw water pumping station (including water intake, water guide pipe to the pumping station and primary sedimentation tank, primary sedimentation tank and pressurization equipment), about 4.5 kilometers of ∮ 1000m/m water pipeline (including water pipeline bridge), water purification plant in Zhangbin Industrial Zone, and wastewater treatment equipment (including regulating tank and clear water tank with a capacity of not less than 200,000 tons), When the turbidity of the raw water at the inlet of the water distribution well is less than 500 NTU, the designed water output should reach 50,000 CMD, and the maximum water output should reach 62,500 CMD.