Client : Sewer Division, Construction Department, Taichung City Government
Planned Location : The 12th rezoning area of Taichung City
Programme Duration :
The planning and design was completed in November 97 ~ May 98 of the Republic of China.
The project started in July 98 of the Republic of China.
It is expected to be completed in March 100
Program Overview :
In order to improve the water quality and environmental sanitation of water bodies in the city, reduce the pollution load of water bodies in the downstream, improve the overall urban development of Taichung City and improve the quality of life, so that urban construction and the natural environment can achieve the goal of sustainable development. The municipal government plans to set up sewage sewers in the east of the slow lane of Huanzhong Road in the 12th Fuxing City Rezoning District of Xitun District, Taichung City to the sidewalk, using the closed mechanical propulsion method, the length of the propulsion is 1600m, and the working well part is planned: 9 oval steel-lined sheet metal propulsion working wells (6.64mX3.5m), 8 circular steel-lined sheet metal reaching wells (R=2.0m), reinforced concrete pipes (RCP) are selected for pipes, the pipe diameter size is ψ1200mm, and the total construction period is 570 calendar days.