Hushan Reservoir downstream tap water project - pre-treatment equipment

Client : Central District Engineering Office of Taiwan Water Supply Co., Ltd
Location : Linnei Township, Yunlin County
Programme Duration : 
    Designed in February 102 of the Republic of China;
    It was completed in April 107 of the Republic of China
Program Overview : 
    The Yunlin area has been classified as a serious stratigraphic subsidence area, and the use of groundwater is controlled, and there is no major source of water supply in the South Changhua area. In order to cooperate with the government's policies to effectively improve the problem of stratum subsidence, water purification and water conveyance projects are carried out under the Hushan Reservoir Project, so as to supply the main livelihood water in the Yunlin area with surface water and reduce the use of groundwater. Due to the high turbidity of the raw water of Jijiweir, a "pre-treatment equipment" (400,000 CMD) is set up to reduce the turbidity and send it to the water purification site, and a complete water pipeline network system is formed with the existing water supply pipelines, water main pipes and connecting pipelines in the water supply area to achieve the above water supply goals.